# AI Agents for Construction Paperwork

> Your project office spends the month reading paperwork against rules you already wrote, and the people doing it are the ones contractors find hardest to hire. AI agents can take the reading.

By Piotr Babel, Partner @ Qvery · Published 2026-11-16 · 14 min read
Canonical: https://qvery.ai/blog/ai-agents-for-contractors/

Most of what a contractor’s project office does in a month is reading one document against another. The people doing it are the ones a growing contractor can least spare: project managers, project engineers, estimators and project accountants.

The reading falls in the same four places every month, and each one lets something expensive through when it is done in a hurry.

**Where the paper sits in a contractor’s month**

| When it lands | What is read against what | What gets through in a hurry |
|---|---|---|
| Before the check run | A sub’s lien waiver, giving up its right to file a lien, against its bill and check | A waiver for last month’s amount, or one that stops a week short |
| Before a trade orders | A product submittal, the data a sub sends for approval, against the spec | A product the spec does not allow, approved and installed |
| Bid day | Each sub’s bid against your scope sheet of what its price has to cover | The low number that leaves out part of the work |
| The weeks after extra work | Daily logs, timesheets and tickets, for who asked and what it took | Hours nobody can prove, so the change order gets cut |

At a general contractor of about 200 people, the example this page works through, those four checks take about **6,550 hours** a year from 19 people. At construction pay that is close to **$448,000** of their time.

They are also the hires contractors find hardest to make. In the 2026 workforce survey of the Associated General Contractors of America, **74%** of firms with openings for project managers and supervisors had trouble filling them.

> At Qvery, we help contractors spend less on office paperwork, with custom AI agents that check subs’ waivers, submittals and bids and build your change order backup.

The agents work on your own forms, specs and systems. They show the page behind every finding, and every approval, payment and award stays with the person who owns it today.

## Every Check Is a Document Read Against Your Own Rule

Your waiver procedure says which waiver you need at which stage, that its amount must equal the check, and that its through date, the last day of work it covers, is the end of the period. The spec section lists what the product must meet.

The scope sheet lists what each trade’s price has to cover. The changes article of your contract says how many days you have to give notice and what counts as proof. The judgment is already written down; the hours go into applying it line by line while the phone keeps ringing.

The costly misses are usually in what a document does not say: a submittal that never mentions the fire rating, a proposal that never mentions the fire alarm, a daily log with no entry for the day of the extra work. Read in a hurry, silence looks like a match.

The part of these agents I care most about is that they never read it that way. A requirement the package does not show is marked “not shown”, a scope line a bidder never mentions is “not stated” with the pages searched, and a day with no log entry is listed as silent.

**What Reddit says**

> We email the waivers to our subs. The pdfs get put into a file labeled “emailed”. When they are returned via email or dropped off in person, the signed version is moved to the file named “signed” (hard copies are scanned).
> ([r/Accounting · Sep 2026](https://www.reddit.com/r/Accounting/comments/1wcrupm/construction_accountantshow_are_you_sending_out/p931a7f/))

> reviewing submittals isn’t just checking that it meets the spec, its also about reviewing that products compatability and interaction with the scope around it.
> ([r/ConstructionManagers · Dec 2025](https://www.reddit.com/r/ConstructionManagers/comments/1pq8axe/is_there_a_trick_to_reviewing_submittals_faster/nusdbqu/))

> Steel bollards around the transformer that is only shown on the landscape plans at the end of the plan-set
> ([r/estimators · Dec 2025](https://www.reddit.com/r/estimators/comments/1ppjojh/common_scope_gaps_as_a_gc/nuoxyt6/))

> That’s literally the job of your foreman or your PM turning man hours into invoices
> ([r/Construction · Nov 2025](https://www.reddit.com/r/Construction/comments/1p3e7l4/lost_4k_this_month_on_unbilled_tm_work_how_do_you/nq40je7/))

Which of the four lands on your desk depends on your side of the subcontract. A general contractor reads its subs’ waivers, submittals and proposals. A specialty contractor sends those up, reads the same paper from its suppliers and the subs it hires, and [builds the backup for its own extra work](https://qvery.ai/blog/extra-work-unbilled-change-orders/).

![Paperwork from the inbox, project systems and the field goes to Qvery’s agents, which read, compare, mark and draft; the person who owns each check decides, and results land back.](https://qvery.ai/blog/ai-agents-for-contractors/illustration-project-office-agents.webp)

*The agents read, compare and draft; the person who owns each check decides what is approved, paid, awarded and billed.*

## What the Four Checks Cost a 200-Person Contractor

Here is the example in full, so you can redo it with your own people: a general contractor of about 200 people, with 19 of them on these checks.

The shares of their week are our assumptions, not a survey’s, and the same ones Qvery’s agent pages use. The pay is the Bureau of Labor Statistics’ May 2025 mean for building contractors, with benefits added at the 31.5% of employer cost they made up in June 2026.

**The four checks at a general contractor of about 200 people (pay: BLS, May 2025, building contractors; benefits at 31.5% of employer cost)**

| Who does the check | People | Share of their week | Cost of one, with benefits | A year |
|---|---:|---:|---:|---:|
| Project managers: change order backup | 6 | 10% | $179,400 | $107,640 |
| Project engineers: submittal review | 6 | 25% | $133,000 | $199,500 |
| Estimators: bid leveling, lining bids up like for like | 4 | 15% | $136,100 | $81,660 |
| Project accountants: lien waiver review | 3 | 15% | $131,200 | $59,040 |
| The four checks | 19 |  |  | $447,840 |

That is **6,552 hours** a year, a little over three people’s full time spread across nineteen. The engineers carry the largest share: the example puts a quarter of their week on submittals, read requirement by requirement.

The table counts time only. The money each check guards, in the last column of the table at the top of this page, comes on top, and it is the reason a contractor puts experienced people on what looks like clerical reading.

The Construction Playbook works through three of these checks the same way, for a general contractor of about 200 people, one job at a time.

Industry Playbook: https://qvery.ai/industry-playbooks/ai-agents-for-construction/

## How Qvery’s Agents Work Through a Contractor’s Month

At Qvery, we build custom AI agents for contractors around the four checks, connected to the inbox, the project platform, the accounting system and the log app your teams already use. From there they run on their own as each document arrives: they read, compare and draft.

None of them approves, pays, awards or prices anything.

### Waivers Before the Check Run

Say a sub’s waiver comes back with its pay application, the bill the sub sent for the month, and your check run holds a check for that sub. The agents read both before the run.

**One waiver against one check, an illustration**

|  | The waiver | The check run |
|---|---|---|
| Form | Conditional, progress payment |  |
| Amount | $86,400 | $91,200 |
| Covers work through | The last day of last month | The end of this month |

Conditional means the sub gives up its lien rights only once that payment is received; the unconditional form, in California’s statutory wording, binds the sub even if it has not been paid.

Before the run, your project accountant sees that check marked, both amounts and dates beside their pages, with a note drafted asking the sub for a corrected waiver. The accountant decides whether the check waits. The agents never write to the sub or say a waiver is valid; that is for your counsel.

### Submittals Against Their Spec Section

A pump submittal arrives, fifty pages of product data for one section of the plumbing spec. The agents put every requirement in the section beside the value the product data gives, with the page on both sides.

Flow and head match. The motor’s efficiency is below the spec’s minimum, and the certificate the section asks for appears nowhere in the package. Your engineer opens three findings instead of fifty pages, with a review comment drafted in your format.

What the agents never judge is how the pump fits the work around it, the clearances and the trades it meets. That stays with your engineer, and it should. To see the comparison on your own paper, drop one package and its spec section into the try below.

Free report: construction/submittal-review

### Bids Lined Up by Scope

Three electrical proposals arrive for one package, each laid out its own way. What comes back is your bid tab, the sheet you compare bids on: your scope lines down the side, a column per bidder, each cell included, excluded or not stated, with the page beside it.

One bidder excludes the fire alarm in a note on page four; another never mentions it. The comparable totals show their arithmetic and stay blank wherever work is unpriced.

Each bidder gets a drafted question about its own gaps, never about anyone else’s price. Your estimator decides who to carry, and the agents never rank a winner.

> The rule an agent reads against matters more than the model doing the reading. So before the agents touch a live waiver or package, we load your waiver procedure, the forms your counsel uses in each state and the spec sections that govern the job. Where a page is too faint or a requirement is never addressed, the finding says so on that line, and a person looks before anything goes out.
>
> Piotr Babel, Partner @ Qvery

### Change Order Backup From the Logs

Extra slab work ran over three days in March on the superintendent’s word. When your project manager flags it for a change order, the request to the owner to be paid for the extra, the agents read the daily logs, timesheets, machine hours and tickets for those days.

They return a dated timeline: who asked, which crew worked how many hours, what equipment ran, with the page behind each line. Beside it sits what is missing, an unsigned ticket for the second day and a log with nothing in it for the third, each with the record that would close the gap.

They count the days under your notice clause and show the arithmetic. Whether the notice went out in time is your counsel’s call, and what the change is worth is your project manager’s.

### Where the Agents Stop

**What the agents may do, and what stays with your people**

| The agents may | The agents never |
|---|---|
| Read the inboxes, folders and exports you name, nothing else | Approve or reject a submittal, or say a product meets a standard |
| Compare each document with its rule and show the page behind every finding | Hold or release a payment, or write to a sub |
| Mark what a document does not say as not shown or not stated | Rank a bidder, recommend an award, or show one bidder’s price to another |
| Draft review comments, notes to subs, questions to bidders and the backup file | Price a change, contact the owner, or call a notice late |
| Log every file they read and every draft they write | Guess a handwritten word or figure, or count a photo as proof of hours |

Before the agents touch a system, we agree with you in writing what they may read and do, and where your files are processed. Bid prices and daily logs, which name your people and their hours, are used for your job alone and never to train a model.

At first, nothing leaves your company until a person has seen it, and you decide which steps the agents later complete on their own. Qvery AI OÜ is an EU company, and the data processing terms we sign with you cover every file the agents open.

## The Same Office Can Carry Next Year’s Work

The hours matter because of who they belong to. In the same contractors’ survey, run in July and August with 1,830 respondents, 82% of firms had openings for salaried staff, and 87% of those said the openings were as hard or harder to fill than a year before.

Estimating jobs were hard to fill for 72% of firms with openings, engineering jobs for 64%. Among contractors with $50.1 million to $500 million in revenue, **54%** added people over the past year, and 73% of all respondents expect to add more in the next twelve months.

In the example, the agents take about half of the reading on submittals, bids and waivers and 40% of the [change order backup](https://qvery.ai/blog/change-order-backup-options/), about **3,150 hours** a year. That is 8% of the office’s time, so each of the 19 people can carry about **8.7%** more work.

If next year’s backlog grows 10%, the office would need 1.9 more people to keep up; with the agents it needs 0.2. Put your own office in the calculator: the people on these checks, next year’s growth, the lift, and the cost of one hire.

(An interactive calculator on the page: roi-project-office-growth.)

On the example’s figures that is **1.7 hires** you don’t have to find, worth $223,570 a year after $24,000 to run the four agents, and every $10,000 of the build is earned back in 0.5 months, about two weeks.

Freed hours are worth the most where the alternative is a hire you cannot find, and in a project office that is where they go.

> Price this paperwork by who it takes, not by the hours alone. The project managers, engineers and estimators doing it are the people contractors say are hardest to hire, so every hour they spend comparing documents is an hour of a hire you may not find. Take the reading off them, keep every decision with them, and next year’s work fits the office you already have.
>
> Vlad Shvets, Partner @ Qvery

## Working With Qvery Starts on Work You Already Closed

The first thing we ask for is work you have already finished, so the agents can be checked against what your people caught:

- A pay period you closed, with its waivers and the check run.
- Ten submittals your engineers already returned, with their comments.
- A trade you already bought, with its proposals and your bid tab.
- A change order you already submitted, with the logs behind it.

Let Qvery Take the Paper Checks Off Your Project Office: https://calendly.com/qvery-vlad/30min

In the first week we learn your waiver procedure, your spec layout, your bid tab and your log format, and settle what the agents may read. In the second, they run on that closed work beside what your people caught by hand, and you compare the two before they touch a live job.

From there they take the current period’s waivers, the next packages and bids and the next change you flag, starting where the stack is tallest, with one of your people checking every finding.

Our agents are reading your real documents about two weeks after we begin.

Each week we count the hours handed back and the problems caught before money moved, and you decide from that count what the agents do on their own next.

## Frequently asked questions



### Do the agents work with Procore, Autodesk or our document system?

They read from where your documents already live: the shared inbox, the project platform or folders where submittals sit, and the exports from your accounting and log software. We connect them during the build. Your teams keep the tools they use today, and the findings come back where your people will see them.

### Does this replace our project engineers’ review?

No. The agents do the reading that comes before the review: every requirement beside the product’s value, with both pages. Your engineer still decides what matters on this job, how the product fits the work around it, and whether the submittal goes back. The architect or engineer who designed the job keeps the design decision.

### What happens with scanned, photographed or handwritten documents?

Each page is read as an image too, so a phone photo of a waiver or a handwritten daily log is read like a typed one. A field the agents cannot make out is marked unreadable, never guessed or counted as a match, and its page is listed for a person to check.

### Can the agents check waivers for every state we build in?

They check each waiver against the form your counsel gives you for each state. Where a state sets the exact wording, as California does, a sub that edits the text or uses another state’s form shows up with both versions next to each other. Whether a waiver is enforceable stays with your counsel.

### Can we start with one of the four checks instead of all of them?

Yes. Each check runs as its own agent on its own documents, so you can start with the one your office feels most and add the others later. Each follows the same path: a week learning your rules, then closed work beside your people, then live work with one of them checking every finding.

### What happens to our documents after the agents read them?

The written agreement we sign before the build names who may open them, where they are processed and how long copies are kept. Bank account numbers on waivers are masked in every report the agents write. Nothing your teams send is used to train a model.

### Will our subs notice anything?

No. The agents never write to a sub or a bidder: the corrected-waiver notes, review comments and bid questions they draft go out from your people, the way they do now.

### Are our bids kept confidential?

Yes. Access is limited to the people your company and Qvery name in writing before the build. Your bid prices never train a model, never reach another contractor, and never appear in another bidder’s questions. Every file the agents read is logged.

### Our subs all use their own forms. Does that break it?

No. Most waivers, proposals and product data arrive on someone else’s paper, and the agents are built to read them as they come. What they compare against is yours: your procedure, your spec, your scope sheet, your contract.

### We are a specialty contractor, not a general contractor. Does this apply to us?

Yes, from the other side of the subcontract. You read the same waivers, submittals and quotes from your own suppliers and the subs you hire, and the change order backup for your own extra work is yours to build. The agents work the same way on your paper.

### How much of our people’s time does the build take?

About three hours from each lead in the first week: your controller, your lead engineer, your preconstruction lead and a project manager. After that, about half an hour a package, a change or a day of waivers while the agents run beside your team.

### What happens when an agent gets something wrong?

Every finding carries the document’s own words and the page, so a wrong reading takes seconds to spot. Your person corrects it and the drafted note or comment updates to match. At first, nothing the agents write leaves your company until someone on your team has seen it.

### What does it cost to run?

We estimate the four agents run for about $2,000 a month in model use, hosting and upkeep at a contractor of about 200 people. The build is a fixed price for a defined result, agreed before any work starts.